argszero/cordis-plugin-tool-deadline-guard

cordis-plugin-tool-deadline-guard

Deployment-level deadlines for dsh tool calls that declare none: mounted on the tools/execute waterfall, it turns a silently wedged tool call into a model-visible TOOL_DEADLINE_EXCEEDED.

未分類cordisdeepseek-harnessdiscussion-7339

@argszero/cordis-plugin-tool-deadline-guard

A cordis plugin for the DeepSeek Harness (dsh) that puts a deadline on tool calls that declare none — the calls for which nothing in the harness arms anything today.

input:  user        "keep working on the migration until it is done"
        assistant   tool_calls: [subagent(prompt="...") id=call-1]
        ⋯           nothing in the log, nothing on screen, turn still "running"

A tool call is bounded exactly when its own definition says so. ToolDefinition.timeoutMs is optional ("Cooperative tool-call timeout budget in milliseconds. Omit for no deadline"), and the core enforcer (@deepseek-ai/dsh-tool-call-timeout-policy, mounted by the base bundle) opens with if (timeoutMs === undefined) return next(). Omit the field and nothing arms anything — not a timer, not a signal, not a diagnostic.

That omission is the norm rather than the exception. Of the 40 non-test source files calling defineTool( at dsh-v0.1.6-alpha.2, 26 contain no timeoutMs at all — 25 shipped tool modules plus the test fixture helper — among them tool-subagent (delegation), mcp-resources (tools owned by someone else's server), tool-terminal, tool-ask-user, the fs read/write/edit tools, and tool-workflow / tool-ralph / tool-todo / plan-mode. Two of those are exactly where a long-horizon run spends its time: a delegation whose child never settles, and a tool on the far side of a network boundary.

The symptom is not an error. It is a turn that keeps rendering as running with nothing anywhere to explain it. Compare the model call: the provider adapters announce a stall (DEFAULT_STREAM_IDLE_TIMEOUT_MS = 300_000, re-armed per chunk by idleWatchdog), so silence is the signature of a wedged tool call, not a wedged model call. Reported as discussion #7339 ("long-horizon tasks stall with nothing in the output"), and adjacent to #6226 (a foreground subagent call whose child process had already exited).

Mounted, the same call ends with something the model can act on:

        tool_result [error] "tool call to "subagent" timed out: it exceeded the
                    600000ms deadline supplied by the tool-deadline-guard mount,
                    and the tool declares no timeoutMs of its own"

0.2.0 adds the other half. A call can also hang before it is dispatched, where no declared budget and no tools/execute wrapper can reach it — see The other half. The same mount now covers that phase too, under its own code (TOOL_PRE_EXECUTE_DEADLINE_EXCEEDED), so a deployment can tell a body that ran too long from a body that never ran at all.

Install

npm install @argszero/cordis-plugin-tool-deadline-guard

In a cordis.yml / profile bundle, add the row (or merge this package's cordis.patch.yml, which contains the same one):

- insert:
    - id: tool-deadline-guard
      name: '@argszero/cordis-plugin-tool-deadline-guard'

With no configuration it bounds every tool that declares no timeoutMs at ten minutes and dispatches every other call untouched.

fielddefaultmeaning
modeautoauto arms deadlines; observe reports what it would bound and dispatches unchanged; off registers nothing
defaultTimeoutMs600000budget for a tool that declares none (10 minutes)
perTool{}per-tool budgets by resolved tool name; wins over defaultTimeoutMs
exempt[]tool names this mount never bounds, whatever else is configured
applyToundeclaredundeclared leaves a tool that declares timeoutMs to the core policy; all bounds every known tool
onExpirycooperativewhat an expiry does; see Honest limits
preExecutetruebound the phase before dispatch too; see The other half
preExecuteTimeoutMsdefaultTimeoutMsbudget for that phase
warnLimit5diagnostics emitted per mount; 0 silences them

A budget must be a positive finite number ≤ 2147483647 (setTimeout's saturation point): a larger value would fire immediately, so "no deadline" is expressed by leaving a tool out of scope — exempt, or mode: off — rather than by asking for infinity.

What it does, precisely

The plugin mounts on two documented public seams — tools/execute (the same one the core policy uses) and tools/pre-execute (the phase in front of it) — and for each dispatch:

  1. Resolves the tool's own definition (ctx.tools.get(exec.name, exec.agent)) and decides whether to arm at all. An unknown tool is the registry's business (UNKNOWN_TOOL), and there is no definition to weigh a budget against.
  2. Arms one timer and one controller, and hands the tool a fused signal (AbortSignal.any([caller, own])) through exec.signal, exactly as the core policy hands it its derived deadline.
  3. Restores the caller's signal in a finally, so post-execute listeners and every later wrapper never see this mount's (possibly already-aborted) signal — the rule the core policy documents for the same reason.
  4. Substitutes a result only when its own timer fired. A call that settles inside its budget returns the tool's own result object, unchanged: no re-dispatch, no wrapper, no diagnostic.
  5. Races the pre-dispatch phase on the same kind of timer and denies the call if that phase is the thing that hung; a phase that settles inside its budget dispatches the call untouched, and a phase that fails on its own keeps the registry's own error path.

An expired body budget produces the shape the loop already understands — isError: true with error.info.code === 'TOOL_DEADLINE_EXCEEDED' — under a code this plugin owns, deliberately not the core policy's TOOL_TIMEOUT: a deployment can then tell "the tool declared a budget and blew it" from "this mount supplied a budget the tool never declared", which is the difference between a tool bug and a deployment policy. ToolTimeoutError-style routing on TOOL_TIMEOUT keeps working for declared tools and does not silently capture these.

An expired pre-dispatch phase is a different fact, so it gets a different code (TOOL_PRE_EXECUTE_DEADLINE_EXCEEDED) and a different shape (deny, not a replaced result). See the next section.

The other half: a call that hangs before it is dispatched

timeoutMs bounds the body. It cannot bound the phase that runs in front of the body, and nothing else does either: the core policy is a tools/execute wrapper, so the tools/pre-execute waterfall completes before the policy is ever reached. A listener there that awaits unbounded work therefore stalls every call in the session with no timer anywhere in the tree — and a deadline mounted on tools/execute is structurally unable to see it, because that waterfall is never entered.

That is not hypothetical. @deepseek-ai/dsh-workspace-changes awaits the turn recorder's snapshot queue inside tools/pre-execute before calling next() (packages/deliverables/workspace-changes/src/index.ts:174-182), so every tool call in the session waits behind it — and when the recorder's git subprocess is the thing that wedged, the pending call names the tool while the wedge is somewhere else entirely. Reported that way in #9515 (git checkpoints among the wedging channels).

Mounted, the same call is denied rather than left pending:

        tool_result [error] tool call to "subagent" was not dispatched: the
                    pre-execute phase exceeded the 600000ms deadline supplied
                    by the tool-deadline-guard mount

with error.info.code === 'TOOL_PRE_EXECUTE_DEADLINE_EXCEEDED'. The second code is not decoration: it says the body never ran, so nothing the call would have done has happened and the model may treat it as pure — which the body arm's code cannot say, because there the body did run and did not finish.

Three things worth knowing before turning it on:

  • applyTo does not apply to this arm, on purpose. That field exists to stop this mount racing the core policy over one body budget; a tool that declares timeoutMs still has an unbounded pre-dispatch phase, so it is bounded here like any other. exempt does apply.
  • prepend: true is what makes it order-independent. Registered in the default position, a deadline mounted after a wedging listener would sit inside the wedge and never be reached at all; prepended, its race encloses whichever listeners are already there (both orders are exercised by the suite).
  • The phase is not cancelled, only abandoned. Nothing can cancel same-process code, so the wedged listener keeps running while the model is told the call never happened. That is the honest shape of a deadline at this seam: it stops the call from being the thing that never ends. A listener whose rejection arrives after the denial is captured into a value, so it cannot surface as an unhandled rejection in the host process.
  • preExecute: false turns the arm off for a deployment that would rather keep the pre-dispatch phase unbounded.

Honest limits

It does not race by default, so it cannot free a tool that ignores its signal. timeoutMs is a cooperative contract: declaring it asserts that the tool forwards exec.signal to an implementation that reaches quiescence when the signal aborts. A tool that never looks at its signal cannot be unblocked from this seam — the wrapper awaits the tool's promise, and a promise that never settles keeps the wrapper (and the turn) waiting. In cooperative mode an expiry is therefore converted into the structured error after the call has settled, which is what keeps the invariant that a committed tool/result corresponds to work that has stopped, and never before. Measured on a fixture that ignores its signal with a 60 ms budget (probe-seam.mjs): the call returned at 402 ms, and only then did the wrapper report.

It cannot see why a call settled. A tool that honors the signal returns an abort artifact; one that ignores it and finishes anyway returns its own late result; both arrive here as "the promise resolved after the timer fired". The core policy resolves that ambiguity by contract — the tool's author declared a budget, so the tool promised to stop — and this plugin resolves it the same way for a tool that declared nothing, which is a promise the deployment is making on the tool's behalf. The consequence, stated plainly: a stubborn tool's late successful result is replaced by the deadline failure. A tool whose late result matters must be listed in exempt. The diagnostic claims only the timing ("x" settled after 402ms, past its 40ms budget; its result was replaced) and never asserts that the tool observed the abort, because this seam cannot know that.

onExpiry: 'replace' buys a usable turn with a weaker guarantee. The wrapper returns the deadline failure as soon as its timer fires and lets the call keep running, unobserved. It does not leave an orphan tool/call in the log — the loop records a tool/result for the call it dispatched, ours (packages/core/agent-loop/src/tool-calls.ts:282), so the transcript stays balanced and the next request is accepted; the abandoned call's rejection is captured into a value, so it cannot surface as an unhandled rejection in the host process. What it does do is let a tool's side effects happen after the model was told the call failed, so a model that retries may duplicate them. For a tool that never settles, this is the only mode that returns at all.

applyTo: 'all' is for deployments without the core policy. The base bundle mounts timeout-policy unconditionally, so on a stock profile undeclared is the correct default: two wrappers racing one budget would produce two contradictory codes for one call. all exists for a composition that dropped the policy — and for the case where a tool's declared budget is larger than the deployment is willing to wait.

Verifying it

npm test                    # tsc, then the wiring suite and the packaging guard
python3 mutations.py        # each claim above, broken one at a time, must go red
node probe-seam.mjs         # the body numbers above, against a real registry
node probe-pre-execute.mjs  # the pre-dispatch seam, with and without the arm
node probe-tools.mjs        # what a real ToolRuntime accepts and what a wrapper sees
node probe-peer-range.mjs   # the peer ranges, read the way npm and pnpm each read them

test/cordis.spec.mjs mounts a real Cordis context, a real ToolRuntime and a real tools/execute waterfall, with unmounted control arms that demonstrate both defects (with no plugin, a tool that declares no budget and never settles stays pending; a listener that awaits unbounded work before next() holds the call before the body runs — and nothing reports either). mutations.py edits the built artifact — never the source — and requires the suite to fail for each of its eighteen mutations, so a claim no test actually holds cannot pass unnoticed; it also reports NOT-APPLIED when a mutation's anchor no longer matches the build, which is the same failure one step earlier. test/packaging.spec.mjs asserts both directions of the manifest against the shipped imports (a runtime import declared only in devDependencies is a consumer's ERR_MODULE_NOT_FOUND; a declared package never imported widens the install closure for nothing) and pins the audited peer ranges.

Compatibility

Requires tools/execute, tools/pre-execute, ToolDispatchExecution, PreToolDecision, ToolDefinition.timeoutMs and ctx.tools.get(name, agent), all present in @deepseek-ai/dsh-tools from 0.1.2-rc.1 onward. The suite is run against two lines besides its own build — 0.1.7-rc.2 (+ cordis 4.0.4) and 0.2.1-alpha.2 (+ cordis 4.0.5-alpha.1); 26/26 each. @deepseek-ai/cordis is a peer; @deepseek-ai/schemastery is the only runtime dependency.

The peer ranges are written as one explicit segment per release line, because a prerelease range is read two ways: npm excludes a prerelease unless a comparator in the range names the same version tuple, while pnpm passes includePrerelease and admits more for the same string. A range that only names the line it was written on therefore installs under one package manager and ERESOLVEs under the other — with the divergence made of exactly the releases people run on. probe-peer-range.mjs is the audit, and test/packaging.spec.mjs pins its result.

License

MIT